
Verilink DIDCSU 2912 User Manual
3-1
Chapter
3
DIDCSU T1 Version
This chapter describes how to configure and administer the
DIDCSU 2912 T1 parameters using the NCM 2000 Craft interface.
For E1 circuits, refer to Chapter 4, “
DIDCSU E1 Version
”.
The following major functions are available through the Craft
interface:
•
Administering nodes
•
Configuring the T1 ports, data ports, and timing parameters
•
Performing diagnostics on network and data ports
•
Evaluating performance and status
•
Monitoring alarms
•
Building, editing, and viewing circuit information
In addition to the NCM Craft terminal interface, you can use
Verilink’s Node Manager—an interactive graphical user interface
(GUI) management software package—to configure a node equipped
with an NCM module. For more information, see the
Node Manager
User Manual
.
Connecting to the Node
Use the following method to connect to the node which contains
the DIDCSU 2912.
Cable Connection
Connect the modular (RJ-11) end of the Craft cable (P/N 458-
102119-008) to the port labeled
LOCAL
on the front panel of the NCM
controller module. Connect the other end of the Craft cable to your
PC or terminal.
NOTE:
This manual assumes the DIDCSU 2912 is part of a node of
Verilink modules which is managed by an NCM 2000. The
DIDCSU 2912 can also be used as a standalone module. In
that case the craft cable is connected directly to the DIDCSU
module. When a DIDCSU is part of a node that is managed by
an NCM, do not connect directly to the DIDCSU module local
port for any reason other than changing the ACP bus
selection, if required.
Komentáře k této Příručce